Informational Postings

Telemetered Flows

02/19/2018

Midwestern Gas Transmission

00-679-2451

MGT Telemetered Flows in Mdkt as of 2/19/2018 11:50:40 PM hrs
 
Previous Gas Day
02/18 Sunday
 
Current Gas Day
02/19 Monday
 
Interconnect
Name
Actual
Flow
D
I
R
Sched
Flow
Daily LMS
Balance
Cumulative
LMS Balance
 
Current
Rate
Current
Accum
Proj EOD
Flow Accum
Sched
Flow
 
Proj EOD
LMS Balance
Proj EOD
Cumulative LMS Bal
East Portland
0.002
D
0.000
-0.002
2.382
 
0.000
0.000
0.000
0.000
0.000
2.382
Portland
76.559
D
73.905
-2.654
20.507
 
47.931
34.348
52.632
42.894
9.738
30.245
Simpson
0.274
D
0.475
0.201
-0.405
 
0.496
0.275
0.464
0.475
-0.011
-0.416
Morgantown
0.301
D
0.000
-0.301
1.872
 
0.080
0.065
0.095
0.000
0.095
1.967
Purdue Farm
0.002
D
0.000
-0.002
0.637
 
0.001
0.001
0.001
0.000
0.001
0.638
Dundee
0.007
D
0.006
-0.001
-0.133
 
0.000
0.000
0.000
0.006
-0.006
-0.139
Whitesville
9.110
D
8.813
-0.297
1.352
 
0.000
7.606
7.606
7.438
0.168
1.520
Western Kentucky
18.597
D
18.374
-0.223
-2.834
 
18.777
11.003
18.166
18.374
-0.208
-3.042
Grandview
0.059
D
0.135
0.076
0.424
 
0.034
*
0.012
*
0.025
0.135
-0.110
0.314
Huntingburg
1.508
D
1.450
-0.058
-4.563
 
0.446
0.550
0.720
1.450
-0.730
-5.294
Grain Processing
13.064
D
13.500
0.436
-0.739
 
12.614
7.388
12.200
13.500
-1.300
-2.039
Wheatland Power
0.001
D
0.000
-0.001
-0.930
 
0.000
2.083
2.083
0.000
2.083
1.152
Scepter
0.725
D
0.746
0.021
0.591
 
0.527
0.376
0.577
0.746
-0.169
0.422
Edwards Port
45.157
D
35.000
-10.157
-17.886
 
5.689
19.079
21.249
18.000
3.249
-14.637
Robinson
0.327
R
0.340
-0.013
-0.316
 
0.309
0.182
0.300
0.340
-0.040
-0.357
Sullivan
4.394
D
5.000
0.606
0.624
 
0.000
0.000
0.000
5.000
-5.000
-4.376
Vigo County
2.320
D
2.734
0.414
2.094
 
2.197
1.200
2.038
2.734
-0.696
1.398
Sugar Creek
84.524
D
86.000
1.476
-0.483
 
80.930
47.377
78.250
84.000
-5.750
-6.234
Marshall
1.955
D
2.243
0.288
1.875
 
0.726
0.635
0.912
2.243
-1.331
0.544
Wabash
0.000
D
0.000
0.000
-0.006
 
0.000
7.408
7.408
12.900
-5.492
-5.498
Vermillion Power Plant
0.000
D
0.000
0.000
-0.900
 
0.000
0.000
0.000
0.000
0.000
-0.900
Oakwood
0.205
D
0.000
-0.205
-5.951
 
0.072
0.061
0.089
0.000
0.089
-5.862
Channahon Delivery
80.738
D
86.422
5.684
17.789
 
91.976
59.001
94.088
85.328
8.760
26.548
Paris Turbine Run-Time Hour Accums
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Sum
0
0
48
66
0
0
0
0
0
0
0
0
114
This report contains preliminary, unverified measurement information obtained directly from SCADA system data.  Though every effort is made to ensure the accuracy of the information, it should be noted that inaccuracies may be present due to the complexities of gathering information from a SCADA system. 
              MIDWESTERN MAKES NO WARRANTIES OR REPRESENTATIONS CONCERNING THE ACCURACY OR COMPLETENESS OF THE METERED FLOW DATA PROVIDED ON THIS PAGE   
 
              KEY
                      LMS Balance:               (-   Due Pipe)    (+   Due Interconnect)
                      Data Flag:                     (=   Alarmed)    (*  Old)    (#  Overridden)
               Flow information is missing for some interconnects due to the unavailability of information or
               at the request of the interconnecting party.