Informational Postings

Telemetered Flows

04/24/2018

Midwestern Gas Transmission

00-679-2451

MGT Telemetered Flows in Mdkt as of 4/24/2018 10:06:47 PM hrs
 
Previous Gas Day
04/23 Monday
 
Current Gas Day
04/24 Tuesday
 
Interconnect
Name
Actual
Flow
D
I
R
Sched
Flow
Daily LMS
Balance
Cumulative
LMS Balance
 
Current
Rate
Current
Accum
Proj EOD
Flow Accum
Sched
Flow
 
Proj EOD
LMS Balance
Proj EOD
Cumulative LMS Bal
East Portland
0.633
D
0.550
-0.083
-0.313
 
0.657
0.327
0.625
0.550
0.075
-0.238
Portland
156.119
D
146.971
-9.148
-4.981
 
248.682
108.709
221.514
229.124
-7.610
-12.591
Simpson
0.538
D
0.725
0.187
-0.411
 
0.560
0.291
0.545
0.325
0.220
-0.191
Morgantown
0.143
D
0.375
0.232
-0.047
 
0.154
0.092
0.162
0.075
0.087
0.040
Purdue Farm
0.001
D
0.000
-0.001
0.044
 
0.001
0.001
0.001
0.000
0.001
0.045
Dundee
0.013
D
0.132
0.119
0.076
 
0.011
0.007
0.011
0.132
-0.121
-0.044
Whitesville
61.791
D
46.676
-15.115
5.041
 
0.000
0.000
0.000
27.903
-27.903
-22.862
Western Kentucky
18.909
D
19.119
0.210
-1.251
 
19.119
9.506
18.179
18.119
0.060
-1.190
Grandview
0.020
D
0.131
0.111
0.143
 
0.032
0.013
0.027
0.032
-0.005
0.138
Huntingburg
0.983
D
1.525
0.542
-0.978
 
0.844
0.539
0.922
0.725
0.197
-0.782
Grain Processing
12.657
D
12.500
-0.157
1.939
 
12.720
6.246
12.016
12.500
-0.484
1.455
Wheatland Power
6.749
D
8.000
1.251
-13.806
 
0.000
0.001
0.001
10.000
-9.999
-23.805
Scepter
0.701
D
0.697
-0.004
-0.341
 
0.515
0.354
0.588
0.697
-0.109
-0.450
Edwards Port
0.000
D
0.000
0.000
10.314
 
0.000
0.000
0.000
0.000
0.000
10.314
Robinson
0.343
R
0.320
0.023
0.530
 
0.337
0.183
0.336
0.320
0.016
0.546
Sullivan
29.048
D
29.850
0.802
4.393
 
20.114
10.458
19.582
19.900
-0.318
4.075
Vigo County
3.241
D
2.946
-0.295
-3.362
 
2.360
1.525
2.596
4.946
-2.350
-5.712
Sugar Creek
83.242
D
82.000
-1.242
55.177
 
86.329
40.457
79.617
83.863
-4.246
50.931
Marshall
1.068
D
2.260
1.192
3.555
 
0.770
0.428
0.777
0.660
0.117
3.672
Wabash
0.000
D
0.000
0.000
-0.404
 
0.000
0.000
0.000
0.000
0.000
-0.404
Vermillion Power Plant
10.387
D
4.000
-6.387
-9.297
 
0.000
7.800
7.800
20.000
-12.200
-21.497
Oakwood
0.079
D
0.000
-0.079
-4.126
 
0.052
0.030
0.054
0.000
0.054
-4.072
Channahon Delivery
117.403
D
111.468
-5.935
-21.056
 
115.262
58.352
110.636
101.824
8.812
-12.243
Paris Turbine Run-Time Hour Accums
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Sum
0
0
0
0
0
0
0
0
0
0
0
0
0
This report contains preliminary, unverified measurement information obtained directly from SCADA system data.  Though every effort is made to ensure the accuracy of the information, it should be noted that inaccuracies may be present due to the complexities of gathering information from a SCADA system. 
              MIDWESTERN MAKES NO WARRANTIES OR REPRESENTATIONS CONCERNING THE ACCURACY OR COMPLETENESS OF THE METERED FLOW DATA PROVIDED ON THIS PAGE   
 
              KEY
                      LMS Balance:               (-   Due Pipe)    (+   Due Interconnect)
                      Data Flag:                     (=   Alarmed)    (*  Old)    (#  Overridden)
               Flow information is missing for some interconnects due to the unavailability of information or
               at the request of the interconnecting party.