Informational Postings

Telemetered Flows

06/23/2018

Midwestern Gas Transmission

00-679-2451

MGT Telemetered Flows in Mdkt as of 6/23/2018 1:37:19 AM hrs
 
Previous Gas Day
06/21 Thursday
 
Current Gas Day
06/22 Friday
 
Interconnect
Name
Actual
Flow
D
I
R
Sched
Flow
Daily LMS
Balance
Cumulative
LMS Balance
 
Current
Rate
Current
Accum
Proj EOD
Flow Accum
Sched
Flow
 
Proj EOD
LMS Balance
Proj EOD
Cumulative LMS Bal
East Portland
0.539
D
0.500
-0.039
0.315
 
0.448
0.323
0.461
0.500
-0.039
0.276
Portland
199.889
D
197.196
-2.693
-57.472
 
208.638
128.528
192.666
199.021
-6.355
-63.828
Simpson
0.382
D
0.300
-0.082
-0.565
 
0.108
0.220
0.253
0.300
-0.047
-0.612
Morgantown
0.050
D
0.000
-0.050
0.093
 
0.020
0.035
0.041
0.000
0.041
0.135
Purdue Farm
0.001
D
0.001
0.000
0.011
 
0.001
0.000
0.001
0.000
0.001
0.011
Dundee
0.000
D
0.023
0.023
0.483
 
0.000
0.000
0.000
0.023
-0.023
0.460
Whitesville
108.167
D
108.840
0.673
51.191
 
136.985
82.353
124.464
132.393
-7.929
43.262
Western Kentucky
16.294
D
15.295
-0.999
-3.454
 
16.304
10.306
15.318
15.295
0.023
-3.431
Grandview
0.003
D
0.008
0.005
-0.023
 
0.000
0.000
0.000
0.008
-0.008
-0.031
Huntingburg
0.526
D
0.500
-0.026
-0.505
 
0.291
0.305
0.394
0.500
-0.106
-0.611
Grain Processing
11.853
D
14.419
2.566
15.588
 
12.247
7.626
11.391
10.465
0.926
16.514
Wheatland Power
0.001
D
29.107
29.106
7.902
 
0.000
0.001
0.001
0.811
-0.810
7.092
Scepter
0.597
D
0.697
0.100
1.217
 
0.923
0.400
0.684
0.697
-0.013
1.204
Edwards Port
47.436
D
65.519
18.083
52.325
 
53.359
32.306
48.709
44.281
4.428
56.754
Robinson
0.336
R
0.330
0.006
0.084
 
0.285
0.197
0.285
0.330
-0.045
0.039
Sullivan
39.301
D
37.231
-2.070
1.774
 
23.153
17.526
24.644
30.764
-6.120
-4.347
Vigo County
2.151
D
1.721
-0.430
-1.876
 
2.260
1.318
2.013
1.721
0.292
-1.584
Sugar Creek
78.170
D
84.000
5.830
-0.280
 
78.774
49.253
73.469
78.000
-4.531
-4.812
Marshall
0.311
D
0.246
-0.065
-0.070
 
0.226
0.216
0.286
0.246
0.040
-0.031
Wabash
0.000
D
0.000
0.000
2.453
 
0.000
0.000
0.000
2.268
-2.268
0.185
Vermillion Power Plant
0.039
D
3.000
2.961
0.083
 
0.000
0.133
0.133
0.000
0.133
0.216
Oakwood
0.024
D
0.000
-0.024
-0.501
 
0.012
0.016
0.020
0.000
0.020
-0.481
Channahon Delivery
87.692
R
71.175
16.517
-59.427
 
139.730
91.532
134.486
171.399
-36.913
-96.339
Paris Turbine Run-Time Hour Accums
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Sum
0
0
0
0
0
0
0
0
0
0
0
0
0
This report contains preliminary, unverified measurement information obtained directly from SCADA system data.  Though every effort is made to ensure the accuracy of the information, it should be noted that inaccuracies may be present due to the complexities of gathering information from a SCADA system. 
              MIDWESTERN MAKES NO WARRANTIES OR REPRESENTATIONS CONCERNING THE ACCURACY OR COMPLETENESS OF THE METERED FLOW DATA PROVIDED ON THIS PAGE   
 
              KEY
                      LMS Balance:               (-   Due Pipe)    (+   Due Interconnect)
                      Data Flag:                     (=   Alarmed)    (*  Old)    (#  Overridden)
               Flow information is missing for some interconnects due to the unavailability of information or
               at the request of the interconnecting party.