Informational Postings

Telemetered Flows

08/19/2017

Midwestern Gas Transmission

00-679-2451

MGT Telemetered Flows in Mdkt as of 8/19/2017 4:11:20 AM hrs
 
Previous Gas Day
08/17 Thursday
 
Current Gas Day
08/18 Friday
 
Interconnect
Name
Actual
Flow
D
I
R
Sched
Flow
Daily LMS
Balance
Cumulative
LMS Balance
 
Current
Rate
Current
Accum
Proj EOD
Flow Accum
Sched
Flow
 
Proj EOD
LMS Balance
Proj EOD
Cumulative LMS Bal
Portland
107.116
D
100.749
-6.367
3.438
 
130.288
97.828
123.943
115.996
7.947
11.385
Simpson
0.000
D
0.279
0.279
3.186
 
0.000
0.000
0.000
0.279
-0.279
2.907
Morgantown
0.043
D
0.050
0.007
0.140
 
0.024
0.039
0.044
0.050
-0.006
0.133
Purdue Farm
0.000
D
0.001
0.001
0.009
 
0.001
0.000
0.000
0.001
-0.001
0.008
Dundee
0.050
D
0.000
-0.050
-0.104
 
0.012
0.006
0.008
0.000
0.008
-0.096
Whitesville
52.033
D
49.717
-2.316
-4.894
 
66.331
49.946
63.242
58.241
5.001
0.107
Western Kentucky
13.483
D
14.359
0.876
-0.945
 
14.261
10.716
13.575
14.359
-0.784
-1.729
Grandview
0.009
D
0.008
-0.001
0.007
 
0.000
0.000
0.000
0.008
-0.008
-0.001
Huntingburg
0.514
D
0.350
-0.164
-1.473
 
0.259
0.353
0.405
0.350
0.055
-1.418
Grain Processing
12.038
D
11.880
-0.158
-2.320
 
12.292
8.460
10.924
11.880
-0.956
-3.276
Wheatland Power
0.001
D
0.000
-0.001
-0.420
 
0.000
0.001
0.001
0.000
0.001
-0.419
Scepter
0.806
D
0.743
-0.063
-1.539
 
0.222
0.541
0.586
0.743
-0.157
-1.696
Edwards Port
0.610
D
3.000
2.390
-0.276
 
0.727
0.464
0.609
0.000
0.609
0.333
Robinson
0.368
R
0.340
0.028
0.564
 
0.366
0.274
0.347
0.340
0.007
0.571
Sullivan
15.233
D
14.925
-0.308
-1.031
 
12.830
10.112
12.683
13.698
-1.015
-2.046
Vigo County
2.598
D
1.532
-1.066
-3.387
 
2.115
1.913
2.337
1.532
0.805
-2.582
Sugar Creek
79.195
D
79.000
-0.195
78.513
 
79.517
59.836
75.775
80.000
-4.225
74.288
Marshall
0.315
D
0.243
-0.072
0.208
 
0.184
0.237
0.274
0.243
0.031
0.239
Wabash
0.000
D
0.000
0.000
-0.003
 
0.000
0.000
0.000
0.000
0.000
-0.003
Vermillion Power Plant
0.135
D
0.000
-0.135
-0.045
 
0.000
0.000
0.000
0.000
0.000
-0.045
Oakwood
0.023
D
0.000
-0.023
-0.387
 
0.000
0.017
0.017
0.000
0.017
-0.371
Channahon Delivery
52.143
D
52.578
0.435
-26.091
 
118.728
37.692
61.490
55.814
5.676
-20.415
Paris Turbine Run-Time Hour Accums
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Sum
171
0
48
66
0
0
0
0
0
9
0
334
628
This report contains preliminary, unverified measurement information obtained directly from SCADA system data.  Though every effort is made to ensure the accuracy of the information, it should be noted that inaccuracies may be present due to the complexities of gathering information from a SCADA system. 
              MIDWESTERN MAKES NO WARRANTIES OR REPRESENTATIONS CONCERNING THE ACCURACY OR COMPLETENESS OF THE METERED FLOW DATA PROVIDED ON THIS PAGE   
 
              KEY
                      LMS Balance:               (-   Due Pipe)    (+   Due Interconnect)
                      Data Flag:                     (=   Alarmed)    (*  Old)    (#  Overridden)
               Flow information is missing for some interconnects due to the unavailability of information or
               at the request of the interconnecting party.